Environmental, Health and Safety (EHS) Plan Contents Section Title Page 1 Introduction 3. Communication of Plan 3. Project EHS Objectives and Targets 3. Principle organisation involved in the Project 3. 2 Organisation and Responsibilities 3. Organisation 3. Responsibilities 3. 3 Existing Environment and Interfaces 5. Surrounding Land Uses, Hazards, Interfaces and Related 5. Restrictions Interfaces with the General public 6. 4 Project Risk Assessment Design and Construction Material 6. Project EHS Risk Assessment 6. 5 Site-Wide Elements 6. Access Control 6. Security 6. Induction 6. Minimum requirements for light vehicles on construction sites 7. Laydown and Storage area 7. 6 Integrated Environmental, Health & Safety management 8. General 8. Legislation Applying to this Project 8. Training 8. Risk Assessment and Method Statements 8.
• Promote a culture in which EHS Management is the prime concern that will never be compromised. • The Decko Ltd C.E.O will provide recourses to eliminate hazards. When on site the Decko Ltd C.E.O will demonstrate commitment to the Project HSE Plan by participating in safety audits and other specific health and safety activities. 2.2.2.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}