Example Problems - websites.umich.edu

CEE 536 CRITICAL PATH METHODS Example Problems Photios G. Ioannou, PhD, PE Professor of Civil and Environmental Engineering Chachrist Srisuwanrat, Former Graduate Student Instructor University of Michigan Ann Arbor, Michigan 48109-2125 TABLE OF CONTENTS 1. NETWORK CONSTRUCTION---------------------------- ---------------------------------------- 3 ACTIVITY ON ACTIVITY ON 2. ACTIVITY-ON-ARROW SCHEDULING------------------------------ -------------------------13 EVENT MISSING FLOATS ..13 3. ACTIVITY-ON-NODE SCHEDULING------------------------------ ----------------------------32 4.

INTF = 7 14 1.2 From MS2, links go into the same node have the same INTF. Thus, INTF of K = 7, and TF of K = 10. 11 13 15 17 G H K FF = 0 INTF = 7 INTF = 7 TF = 10 14 1.3 From MS3, activities in the activity chain have the same TF. Thus, TF of K, G, and H are 10. 1.4 From MS1, FF of G and H = 0. INTF of G and H are 10. 11 13 15 17 G H K FF = 0 ...

Loading..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Example Problems - websites.umich.edu

Related search queries