Transcription of Fabrication and erection of Tokyo Gate bridge - iabse-bd.org
{{id}} {{{paragraph}}}
IABSE-JSCE Joint Conference on Advances in bridge Engineering-III, August 21-22, 2015, Dhaka, Bangladesh. ISBN: 978-984-33-9313-5. Amin, Okui, Bhuiyan, Ueda (eds.) Fabrication and erection of Tokyo gate bridge T. Yoneyama Kawada Industries, Inc., Toyama Plant, Nanto-city, Toyama, Japan Y. Fujii Kawada Industries, Inc., Tokyo Head Office, Tokyo , Japan ABSTRACT: Tokyo gate bridge was planned to mitigate traffic congestion on coastal roads around Tokyo Port and to provide access to a future logistics hub. In engineering, there were two major restrictions; airspace above the bridge due to proximity to Haneda Airport and seaway clearance beneath the bridge for vessel pas- sage. These constrains resulted in selection of a composite structure with steel truss members and a steel box girder in lieu of a cable-stayed or a suspension structure. In order to save construction cost, several signif- icant measures were adopted.
269 Figure 2. General Information of Tokyo Gate bridge 2 THE BRIDGE’S KEY FUTURES FOR ENGINEERING AND CONSTRUCTION The following are the key futures of design, fabrication and erection of the bridge.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Metal Fabrication and Joining Technologies, Fabrication and, Sheet and plate metalwork, Performance Fabrication Item Price List, THERMOPLASTICS WELDING IN INDUSTRIAL FABRICATION, Old School Chopper Frame Fabrication, Useful Fabrication Information Bending, FABRICATION AND ERECTION OF STRUCTURAL, Integrated Circuit