Transcription of FACILITY SECURITY PLAN (FSP) REVIEW CHECKLIST
{{id}} {{{paragraph}}}
Enclosure (3) to NAVIGATION AND VESSEL inspection CIRCULAR No. 03-03, CH-2 3-1 United States Coast Guard FACILITY SECURITY plan (FSP) REVIEW CHECKLIST FACILITY Name: FACILITY Type: FACILITY ID Number: MISLE Activity Number: Date(s) Conducted: CG Unit: 1st Reviewer: 2nd Reviewer: Guidance for completing the FACILITY SECURITY plan (FSP) REVIEW CHECKLIST Coast Guard FACILITY inspectors shall complete the CHECKLIST by verifying the contents of the FSP submitted for REVIEW , are in line with the requirements as per 33 CFR Each inspected item contained in the CHECKLIST must be notated as one of the following: Satisfactory -Item meets requirements contained in the guide and referenced regulations.
The plan may not be approved if the FSA report or the CG-6025 form is missing. Enclosure (3) to NAVIGATION AND VESSEL INSPECTION CIRCULAR No. 03-03, CH-2 Sensitive Security Information (when filled out)
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}