Transcription of Fitted Frame Pre-Hanging Assembly Instructions BASE KIT
{{id}} {{{paragraph}}}
Fitted Frame Pre-HangingAssembly InstructionsBASE KIT base JAMB PACKAGE TO CONTAIN:1 ea. Jamb Header1 ea. Hinge Jamb1 ea. Lock Jamb1 ea. 37" Brown Foam Weather Strip2 ea. 82" Brown Foam Weather Strip1 ea. Pre-Hanging Hardware (excluding hinges)1 ea. Accessory Bag1 ea. Jamb Kit Installation Instructions1 ea. ThresholdBase Jamb HeaderThresholdHinge Jamb BaseLock Jamb BaseInswing: 5-5/8" Fixed VinylHandicap:1/2" x 4-9/16" AluminumOption: ADA 1/2" x 6-9/16" AluminumFRAME PREPARATION1. Frame Component SelectionSelect Frame components. Figure APosition Frame on work surface. Figure B2. Assemble base FrameBend tabs down and out towards throat side of side Frame . Figure C3. Attach Fixed Vinyl or ADA ThresholdUse (4) #6 x 1-1/2" pan head type 17 screws.
Fitted Frame Installation Procedures TRIM KIT Taylor Entrance Systems 631 N. First Street West Branch, MI 48661 800-248-3600 www.taylordoor.com PAGE 1 TRIM KIT PACKAGE TO CONTAIN:
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Spring Steel Fasteners KwikWire™ Hanging System, KwiKwire™ hanging system, Instructions, Instructions and Parts List, Hanging, LOS-C Series Installation Instructions, Hydraulic Master/Slave Combo Installation Instructions, VERBAL INSTRUCTIONS FOR, Red Church Bird House Plans, YARD ART 2, Curlin Medical 4000 Series Manual Rev