PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: air traffic controller

FL-RC-10-3 Lifting Platform - ARIHetra

READ THIS manual CAREFULLY BEFORE OPERATINGAND RETAIN FOR YOUR RECORDS! owner s ManualFL-RC-10-3 Lifting Platform0408 Inspect the ARI-HETRA FL-RC-10-3 Lifting Platform immediately upon delivery. A list of the components and a drawing of their set-up is included in section If shipping damage is evident, inform the delivering carrier immediately and contact ARI-HETRA service The ARI-HETRA FL-RC-10-3 Lifting Platform must be used with two (2) Lifting posts of the ARI-HETRA mobile Lifting system. This specific section will address the utilization and safety considerations of the combined use of the Lifting Platform and the two (2) Lifting posts. The set-up and use of the mobile Lifting posts is addressed in sections 2 through 6 of the HDML Operation and Service Instructions. (Please call ARI-HETRA for a copy if you do not have one) All service technicians using this equipment must thoroughly familiarize themselves with the safe and efficient use of the ARI-HETRA Lifting posts as outlined in sections 2 through 6 of the HDML Operation and Service Instructions.

5 Owner's Manual General Specifications 1.6 Prior to set-up and operation of the lifting platform (FL-RC-10-3), completely familiarize yourself with the set-up and operation of the two (2) ARI

Loading..

Tags:

  Manual, Operations, Owner, Lifting, S manual, Platform, Lifting platform, Fl rc 10 3

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of FL-RC-10-3 Lifting Platform - ARIHetra

Related search queries