Transcription of FM-200
{{id}} {{{paragraph}}}
FM-200 SIGMA SERIESENGINEEREDSYSTEMSDESIGN,INSTALLATI ON,OPERATION&MAINTENANCEMANUALI ssued July 1, 2000 Revision CRevised February 16, 2004 Manual Part Number 30000049 FM-200 SIGMASERIESENGINEEREDSYSTEMSDESIGN,INSTA LLATION,OPERATION&MAINTENANCEMANUAL S/N 30000049 ISSUED: 7/01/00 REVISED: 2/16/04 Page iContentsLIST OF iiiLIST OF viii1 GENERALINFORMATION AND SAFETYPRECAUTIONS and Chemical Decomposition Reference Data .. 52 SYSTEMDESCRIPTION AND OPERATION System System 213 SYSTEMDESIGN 1 Agent 2 Number of 3 Container 4 Nozzle Step 5 Nozzle Location.
will not be approved for Factory Mutual installations. FM-200 Systems using concentrations below 6.25% are not UL & ULC Listed nor Factory Mutual Approved. UL, ULC & FMRC require multiple tiers of nozzles for heights above 16' 0" (4.88 M). After an FM-200 system discharge, the FM-200 cylinder(s) should be returned to an authorized
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}