Transcription of FOUNDATION DESIGN AND CONSTRUCTION
{{id}} {{{paragraph}}}
GEO PUBLICATION No. 1/2006 FOUNDATION DESIGN AND CONSTRUCTION GEOTECHNICAL ENGINEERING OFFICE Civil Engineering and Development Department The Government of the Hong Kong Special Administrative Region 2 The Government of the Hong Kong Special Administrative Region First published, 2006 Prepared by : Geotechnical Engineering Office, Civil Engineering and Development Department, Civil Engineering and Development Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. Captions of Figures on the Front Cover Top Left : CONSTRUCTION of Large-diameter Bored Piles Top Right : Pile Loading Test Using Osterberg Load Cell Bottom Left : foundations in Marble Bottom Right : CONSTRUCTION of Large-diameter Bored Piles on Slope 3 FOREWORD This publication is a reference document that presents a review of the principles and practice related to DESIGN and CONSTRUCTION of FOUNDATION , with specific reference to ground conditions in Hong Kong.
4.4.2.3 Continuous flight auger piles 60 4.4.2.4 Large-diameter bored piles 61 4.4.2.5 Barrettes61 4.4.3 Hand-dug Caissons 62 4.5 SPECIAL PILE TYPES 65 4.5.1 General 65 4.5.2 Shaft- and Base-grouted Piles 65 4.5.3 Jacked Piles 66 4.5.4 Composite Piles 67 5. CHOICE OF PILE TYPE AND DESIGN RESPONSIBILITY 69 5.1 GENERAL 69
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}