Transcription of GENERAL CONTRACTOR/CONSTRUCTION …
{{id}} {{{paragraph}}}
Department of Finance and Administrative Services GC/CM CONTRACTING GUIDE 12/2011 CITY PURCHASING AND CONTRACTING SERVICES DIVISION 1 INTRODUCTION This manual provides the policy framework, procedures and guidance regarding the use of the GENERAL CONTRACTOR/CONSTRUCTION Manager (GC/CM) alternative public works delivery method. It is written for City departments. PCSD issues all forms, templates, contract boilerplates and similar documents to be used throughout the GC/CM contracting process. BACKGROUND RCW provides the GC/CM approach to public works. A GC/CM is procured through a multi-part selection process that includes consideration and evaluation of the GC/CM bidder qualifications and experience together with some cost elements. The GC/CM is selected early in design and generally assists the Owner in evaluating the project during the design phase and then provides construction management services.
• Value engineering to optimize the cost and performance of the project • Team approach • Fewer change orders • Time savings Balances and mitigates risk between the Owner, Designer and the Contractor
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Risk-Based Approach Guidance for Life Insurance, Risk-Based Approach Guidance for, Life Insurance, RISK-BASED APPROACH GUIDANCE, Guidance, Risk-based capital and governance in, INSURANCE, History of Insurance, Performance Based Gas Detection System Design, Performance‐Based Gas Detection System Design, Australian Procurement and Construction Council, Australian Procurement and Construction Council Inc, Risk