Transcription of General Requirements R0154 Construction Aids Reference …
{{id}} {{{paragraph}}}
General RequirementsR0154 Construction AidsR015433-10 Contractor EquipmentRental Ratesshown elsewhere in the book pertain to late model highquality machines in excellent working condition, rented from equipmentdealers. rental rates from contractors may be substantially lower than therental rates from equipment dealers depending upon economic conditions;for older, less productive machines, reduce rates by a maximum of 15%. Anyovertime must be added to the base rates. For shift work, rates are rule of thumb is 150% of one shift rate for two shifts; 200% for periods of less than one week, operated equipment is usually moreeconomical to rent than renting bare equipment and hiring an to move equipment to a job site (mobilization) or from a job site(demobilization) are not included in rental rates, nor in any Equipment costson any Unit Price line items or crew listings.
General Requirements R0154 Construction Aids R015433-10 Contractor Equipment Rental Rates shown elsewhere in the book pertain to late model high quality machines in excellent working condition, rented from equipment
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}