Geometric Design of Existing Non-Freeway (3R) - Indiana

Indiana DEPARTMENT OF TRANSPORTATION 2013 Design MANUAL CHAPTER 55 Geometric Design of Existing Non-Freeway (3R) Design Memorandum Revision Date Sections Affected 13-09 April 2013 Ch. 55 13-11 May 2013 (02) 14-10 July 2014 , (03), Figures 55-3A through 55-3H NOTE: This chapter is currently being re-written and its content will be included in Chapter 302 in the future. Page 2 2013 Indiana Design Manual, Ch. 55 TABLE OF CONTENTS TABLE OF CONTENTS .. 2 LIST OF FIGURES .. 4 INTRODUCTION .. 5 GENERAL REQUIREMENTS .. 6 Applicability .. 6 (01) 3R Scope-of-Work Definition .. 6 (02) National Highway System (NHS) Project .. 8 (03) Non-NHS Project .. 9 (04) Procedures .. 11 Background .. 11 Geometric - Design Approach .. 12 3R Project Evaluation .. 13 Geometric Design CRITERIA [REV.]

LOS of D or better, it will be acceptable to design the project using the 3R geometric design criteria described in this chapter. Ifthe projected LOS will not satisfy LOS of D, the facility will be designed according to the criteria for new construction or reconstruction. Eachbridge replacement, bridge deck replacement, or bridge-widening

Tags:

  Using, Reconstruction, Indiana

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Geometric Design of Existing Non-Freeway (3R) - Indiana

Related search queries