grid CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version (July 2014) Page 2 grid CONNECTION Code for RPPs in South Africa - Version July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA grid Code Secretariat Contact: Mr. B. Magoro or Mr. T. Khoza Eskom Transmission Division Box 103, Germiston 1400 Tell: +27 (0)11 871 2774 / 2368 Fax: +27 (0)86 663 8418 Email: or Page 3 grid CONNECTION Code for RPPs in South Africa - Version July 2014 Table of Contents Paragraph Page Number 1.
Grid Connection Code for RPPs in South Africa - Version 2.8 July 2014 (b) Category B: 1 MVA – 20 MVA and RPPs less than 1 MVA connected to the MV This category includes RPPs with rated power in the range equal or greater than 1 MVA
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}