Transcription of GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS …
{{id}} {{{paragraph}}}
GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE distribution SYSTEM (DS) IN SOUTH AFRICA Version (July 2014) Page 2 Grid CONNECTION Code for RPPs in South Africa - Version July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. B. Magoro or Mr. T. Khoza Eskom Transmission Division Box 103, Germiston 1400 Tell: +27 (0)11 871 2774 / 2368 Fax: +27 (0)86 663 8418 Email: or Page 3 Grid CONNECTION Code for RPPs in South Africa - Version July 2014 Table of Contents Paragraph Page Number 1. Grid CONNECTION Code Basis .. 5 Legislation .. 5 Handling of Non-compliances and Deviations.
The amount of active power (MW), measured at the POC, that the RPP could produce based on plant availability as well as current renewable primary energy conditions (e.g. wind speed, solar radiation). Code The Distribution Code, the Transmission Grid Code or any other Code, approved by NERSA . Connection Agreement As defined in the Code ,
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}