Transcription of Hamilton County Water Quality Program Rules and ...
{{id}} {{{paragraph}}}
Hamilton County Water Quality Program Rules and Regulations SECTION. 1 General Provisions 2 Definitions 3 Land Disturbance Permit 4 Stormwater System Design: Construction and Permanent Stormwater Management 5 Permanent Stormwater Management Operation, Maintenance and Inspection 6 Riparian Buffers 7 Existing Locations and Developments 8 Illicit Discharges 9 Enforcement 10 Penalties 11 Program Fees 12 Appeals 13 Variances 14 Overlapping Jurisdictions Section 1. General Provisions. (1) Program Area. This Ordinance and Resolution is applicable and uniformly enforceable within the Tennessee municipalities of Collegedale, East Ridge, Lakesite, Lookout Mountain, Red Bank, Ridgeside, Soddy-Daisy, and Walden designated unincorporated areas within Hamilton County , and other eligible communities which may join the Hamilton County Water Quality Program (hereinafter called the Program ) and enact this Ordinance and Resolution from time to time.
6 11/10/2015 (21)Erosion Prevention and Sediment Control Plan (EPSC Plan). A written plan (including drawings or other graphic representations) that is designed to minimize the erosion and sediment runoff
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}