Transcription of Heating CableHeating Cable – Testing Procedures September ...
{{id}} {{{paragraph}}}
Heating Cable Heating Cable Testing ProceduresSeptember 1 2010 September 1, 2010 September 20101 Service Strategy1 Company ConfidentialAgenda System Overview System Start-up Testing Megger TestSystem Startup Mechanical Checks Electrical Tests Cold Resistance Test Stabilized Current Test End of Circuit Voltage Test Documentation Maintenance For Each Test What is itWhat is it Why do it When to do it How to do it How to do itSEPTEMBER 20102 OverviewSEPTEMBER 20103 System Start-up General Considerations All parties involved should have a representative present for start-up. All start-up info should be logged and signed off by appropriate parties. All test equipment used for start-up Testing should be in good repair and CALIBRATED! Have all appropriate drawings, specifications, and instruction sheets on-hand for freference.
System Start-up • General Considerations – All parties involved should have a representative present for start-up. – All start-up info should be logged and signed off by appropriate parties.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Outside Plant Telephone Cable Testing & Fault, CABLE, Testing and Troubleshooting Trace Heating Cable, Testing and Troubleshooting Trace Heating Cable TESTING, Fully automatic cable sheath testing, Fully automatic cable sheath testing and, Testing, Cable Testing, CABLE TESTING STANDARDS, EMC Testing Part 5, TESTING & ELECTRONICS, Wire