PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: barber

High risk construction work Safe Work method statement ...

1/4 HIGH RISK construction WORK SAFE WORK method statement TEMPLATENoteWork must be performed in accordance with this SWMS must be kept and be available for inspection until the high risk construction work to which this SWMS relates is the SWMS is revised, all versions should be a notifiable incident occurs in relation to the high risk construction work in this SWMS, the SWMS must be kept for at least two years from the date of the notifiable conducting a business or undertaking (PCBU) nameContact detailsPrincipal contractor (PC) nameContact details Works managerContact phoneDate SWMS provided to PC (DD/MM/YYY)Work activity (Job description)Workplace locationHigh risk construction work: Risk of a person falling more than two metres (Note: in some jurisdictions this is three metres)Likely to involve disturbing asbestosWork in or near a shaft or trench deeper than m or a tunnelWork on or near chemical, fuel or refrigerant linesTilt-up or pre-cast concrete elementsWork in areas with artificial extremes of temperatureWork on a telecommunication towerTemporary load-bearing support for structural alterations or repairsUse of explosivesWork on or near energised electrical installations or servicesWork on, in

installation of falsework and timber bearer and joist will be a minimum of 450 mm wide. • Handrails (no less than 900 mm in height), mid rails and kick boards will be installed on formwork decks to prevent workers and objects falling. Handrails are to be robust construction and installed in accordance with the specific design.

Loading..

Tags:

  Falsework, Of falsework

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of High risk construction work Safe Work method statement ...