How To Recover For A Subcontractor’s Negligence
the contractor’s methods by requiring the contracto r to work with the principal to resolve any disputes over how the contractor did its work. The principal provided all engineering drawings and specifications and all construction equipment, tools, and suppli es as required in writing. The principal also h ad a