Transcription of Human-System Interface Design Implementation Plan
{{id}} {{{paragraph}}}
KEPCO & KHNP HSI Design Implementation plan APR1400-E-J-NR-12008-NP, KEPCO & KHNP Human-System Interface Design Implementation plan Technical Report September 2013 Copyright 2013 Korea Electric Power Corporation & Korea Hydro & Nuclear Power Co., Ltd All Rights Reserved Non-Proprietary KEPCO & KHNP HSI Design Implementation plan APR1400-E-J-NR-12008-NP, KEPCO & KHNP i Revision History Revision Page (Section) Description 0 All Issue for Standard This document was prepared for the Design certification application to the Nuclear Regulatory Commission and contains technological information that constitutes intellectual property. Copying, using, or distributing the information in this document in whole or in part is permitted only by the Nuclear Regulatory Commission and its contractors for the purpose of reviewing Design certification application materials.
The Implementation Plan and Results Summary Report of functional requirements analysis (FRA) and function allocation (FA) (Reference 2) and task analysis (TA) (Reference 3) are developed during the analysis phase and provided as the design input for the HSI designer of each design entity.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Distributed system, York’s Distributed System Implementation Plans, Distributed, System, DISTRIBUTED SYSTEM IMPLEMENTATION PLAN, Implementation of Data Integration using Distributed, Implementation of Data Integration using Distributed Systems, System Implementation Implementation, Plan, System Integration: A Plan of Implementation, Intelligent Distributed System for Strategic Decision, Distributed Database, Implementation, Project Assignment P3: Design Your, California’s Distributed Energy Resources Action Plan