PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bachelor of science

ICC PEI LLC

USG Shaft Walls, Stair Walls & Corridors Assemblies Evaluated For1. Non Axial Load Bearing Wall2. Transverse Load Capacity3. Fire Resistance4. Abuse ResistanceCode ComplianceComponent Descriptions1. J-Runnersver 1 of 11 ICC PEI LLC2. Meets the requirements for structural integrity of exit enclosures and elevator hoist way enclosures for High-Rise Buildings(Section of the 2012, 2015 and 2018 IBC) when installed in accordance with the abuse resistant assemblies listed onpage two (2) of thisAssembly Evaluation Report(AER). Approved abuse resistant assemblies have been tested inaccordance with ASTM Shaft & Stair Wall Systems are generally constructed with the following components. 550 West Adams StreetChicago, IL 60661 For attachment to steel framed construction install floor and ceiling J-runners and End wall J-Runners or E-Studs, oncolumns and beams before the steel is fireproofed, except where Z-Clips are used as in UL Design metal framing members used in construction ofUSGS haft & Stair Wall Systemsare manufactured from coldroll-formed light gauge galvanized steel conforming to ASTM A653 SS Grade 33 for 24ga.

5. For Fire Resistance details and construction methods, refer to UL Design #U415 System A and the USG installation instructions. Two-Hour Cavity Shaft Wall (Non-Load Bearing), See Figure 2 1. A minimum 2-1/2-in deep 24 gauge floor and ceiling J-runners, attached to structure as described above.

Loading..

Tags:

  Installation, Instructions, Installation instructions

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of ICC PEI LLC

Related search queries