Transcription of IMDAS RIMS Phase 2 User Guide - NALC Branch 283
{{id}} {{{paragraph}}}
Intelligent Mail Data Acquisition System ( IMDAS ) Regional Intelligent Mail Server Phase II user Guide Version United States Postal Service Engineering Package Technology and Visibility Merrifield, VA IMDAS RIMS Phase II user Guide Version: Engineering Package Technology and Visibility Date: April 29, 2014 ii Revision History Date Version Description Author 09/13/2012 Initial Draft Noblis 09/14/2012 Final Noblis 07/22/2013 Final Draft Noblis 09/04/2013 Changes to user interface based on defect reports and change requests version number synchronized with the SRD and SDD Noblis 09/20/2013 Changes to user interface, new screen shots Noblis 9/27/2013 More detail added Noblis 10/3/2013 Configuration Local Site Setting screen shot updated Noblis 11/18/2013 Added Config tab to District Role Removed District and Area from HQ Role Noblis 12/30/2013 Updated the Special Reports section Additional editorial changes to make report descriptions consistent with screen shots.
IMDAS RIMS Phase II User Guide Version: 2.10 Engineering Package Technology and Visibility Date: April 29, 2014 iii Table of Contents
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}