1 Industrial Battery Charger Installation and Operation Manual 2 INDEX Page Section Description 3 - Safety Instructions 4 Installation 4 Receiving 4 Location 4 Line Voltage Adjustments 6 AC Service Requirements 6 Connecting AC Service to Charger 7 Grounding the Charger 7 Battery Connector and Charger Cable 7 Charging Rate Adjustment 8 Operation 8 046-0164 Control 13 046-0172 Control 18 Optional Features 18 Troubleshooting & Maintenance 20 Replaceable Parts 20 Ordering Information 20
• Two conductors and ground wire required for single phase. • Three conductors and ground wire required for three-phase 1.5. Connecting AC Service to the Charger 1.5.1 Single-Phase Models Connect the AC service to the L1 and L2 terminals located at the end of the AC fuse block.