Transcription of Installation, Operation, & Maintenance Manual
{{id}} {{{paragraph}}}
installation , Operation, & Maintenance ManualLight and Medium DutySluice GatesModels 1001C and 101C Light DutyModel 20-10C Medium DutyDO NOT DISASSEMBLE GATE FOR INSTALLATION23 TABLE OF Things To Do and Not Do ..5-6 installation instructions ..6-7 installation by Attaching to Pipe ..6 installation of Flat Back ..6 installation on Corrugated installation to Concrete Pipe with Taper Setting ..8-11 Troubleshooting ..114 FOREWORDThe purpose of this installation , Operation, and Maintenance Manual is to provide information on the correct procedures for installation , adjustment, operation and Maintenance of Fresno Valves Light and Medium Duty Sluice Gates and their component Models covered by this Manual follow: Model 1001C and Model 101C Light Duty, round opening, fl at and spigot back. Model 20-10C Medium Duty, round opening, fl at and spigot backInstallation NoteThese gate models can be easily warped during installation by rough handling and storage.
INSTALLATION INSTRUCTIONS FOR MODELS 101C AND 20-10C Caution - These models are easily warped during installation. These instructions must be carefully followed for correct gate installation. This gate was accurately machined, assembled and inspected before it left the factory. Wedges and wedge blocks were adjusted to make proper metal-to-metal ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}