Transcription of Installation, Operation, and Maintenance
{{id}} {{{paragraph}}}
SSAAFFEETTYY WWAARRNNIINNGGO nlyqualifiedpersonnelshouldinstalland servicethe Installation, starting up, and servicingof heating,ventilating,andair-conditioninge quipmentcan be hazardousand requiresspecificknowledgeand ,adjustedor alteredequipmentby an unqualifiedpersoncouldresultin deathor seriousinjury. Whenworkingon the equipment,observeall precautionsin theliteratureand on the tags,stickers, and labelsthat are attached to the PackagedTerminalAir Conditioner(PTAC)ModelsPTEFandPTHFI nstallation, Operation, and Maintenance 2015 TraneAll rightsreservedPTAC-SVX002A-ENIntroductio nThe ProSpace PackagedTerminalAir Conditionersand heat pumpsprovide a high standardof qualityinperformance,workmanship,durabil ityand appearanceas they heat and cool the occupiedair manualprovidesinformationfor ease ofinstallation,operationand modelsaredesignedfor through the wall includedwith all InformationRead this manualcompletelyand carefullybeforestarting any downthe modeland serialnumberon the spaceprovidedon the modeland serialnumbercan belocatedon the serialnumberplateattached to the are requiredfor any :: Ensurethatthismanualis left ,Cautions,and NoticesSafetyadvisoriesappearthrougho
installation, operation and maintenance. All models are designed for through–the–wall installation. Separate installation instructions are included with all accessory components. General Information Read this manual completely and carefully before starting any work. Write down the model and serial number on the space provided on the product
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}