Transcription of Installation, Operation, Maintenance
{{id}} {{{paragraph}}}
SAFETY WARNING Only qualified personnel should install and service the equipment. The installation , starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the Commercial to 50 Ton 60 to Ton 50 HzCV or VAV Rooftop Air Conditionerswith ReliaTel Controls, R-410A RefrigerantNovember 2010RT-SVX34C-ENInstallation, Operation, MaintenanceModel Numbers B and later design sequenceTC*, TE*, YC*330B, 360B, 420B, 480B, 600B (60 Hz/3 phase)TC*, TE*, YC*275B, 305B, 350B, 400B, 500B (50 Hz/3 phase) 2010 Trane All rights reserved RT-SVX34C-ENWarnings, Cautions and NoticesWarnings, Cautions and Notices.
This booklet describes the proper installation, st artup, operation, and maintenance procedures for TC_, TE_, and YC_22.9 to 50 Ton CV (Constant Volume) and VAV (Var iable Air Volume) applications. Refer to the table of contents for a listing specific topics.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}