Transcription of Installation, Operation, Maintenance
{{id}} {{{paragraph}}}
SAFETY WARNING Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the Commercial to 50 Ton 60 to Ton 50 HzCV or VAV Rooftop Air Conditionerswith ReliaTel Controls, R-410A RefrigerantNovember 2010RT-SVX34C-ENInstallation, Operation, MaintenanceModel Numbers B and later design sequenceTC*, TE*, YC*330B, 360B, 420B, 480B, 600B (60 Hz/3 phase)TC*, TE*, YC*275B, 305B, 350B, 400B, 500B (50 Hz/3 phase) 2010 Trane All rights reserv
for B and later design sequence on units with R-410A refrigerant. RT-SVN34A-EN (March 2009) Original issue of manual: provides specific instal lation, operation and maintenance instructions for A and later design sequence on units with R-410A refrigerant. ATTENTION: Warnings, Cautions and Notices appear at appropriate sections throughout
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}