PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: marketing

INSTALLATION SHEET - BAK Industries

INSTALLATION SHEETAny damaged or missing parts? Parts will be shipped to you directly. Call 844-779-8986 Mon - Fri 5:30 am - 4 pm Pacific Time 1 BAK Industries 720 Jessie Street, San Fernando, CA 91340 818-365-9000 Fax: 818-365-9022 # 318A0029 Rev. 4-13-16 Laurmark Enterprises, Inc., 2016 2 Make sure the clamp is inserted all the way up into the rail and clamp teeth are alinged to rail slots to ensure a secure sure the rail is clamped square as shown. Start at the front, and place the first clamp approx 6 to 9 inches tailgate. Place BAKFlip rail on truck bed with silver bracket all the way forward and toward the center of bed as shown. Refer to enclosed Spacing & Shimming SHEET for more details. Rails should be completely the truck does not have a drop in bedliner, install the cab/bulkhead seal (weather strip). Wipe paint-ed surface with isopropyl alchol before applying. If the truck has a drop in bedliner, no seal will be : Some drop in liners may require trimming in the corners to fit the rail in the opening.

21 22 FIGURE 1 BAK Industries • 720 Jessie Street, San Fernando, CA 91340 • 818-365-9000 • Fax: 818-365-9022 • bakindustries.com Part# 318A0029 Rev. 4-13-16

Loading..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of INSTALLATION SHEET - BAK Industries

Related search queries