PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: biology

Instructions - Torrent Engineering & Equipment

GEK-95351.. GE Industrial Systems Instructions vertical induction Motors high thrust hollow & Solid-Shaft and In-Line Solid-Shaft Frames 182-405 NEMA Type P Base TEFC & Explosion-Proof GEK-95351. Safety Precautions high voltage and rotating Be sure that the shaft key is fully captive parts can cause serious or fatal before the motor is energized. injuries. Installation, opera- tion, and maintenance of elec- Avoid extended exposure in close proximity tric machinery should be per- to machinery with high noise levels. formed by qualified personnel. Familiarization with NEMA Publication MG-2, Use proper care and procedures in handling, Safety Standard for Construction and Guide for lifting, installing, operating, and maintaining Selection, Installation and Use of Electric Mo- the Equipment . tors and Generators, the National Electrical Code, and sound local practices is recom- Do not lift anything but the motor with the mended.

gek-95351 4 vertical induction motors high thrust hollow & solid-shaft and in-line solid shaft frames 182-405 nema p base tefc & explosion-proof i. introduction

Loading..

Tags:

  High, Instructions, Motor, Hollow, Induction, Vertical, Thrust, Vertical induction motors high thrust hollow

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Instructions - Torrent Engineering & Equipment

Related search queries