Transcription of Integrated Waste Management Facilities Project Profile
{{id}} {{{paragraph}}}
ENVIRONMENTAL PROTECTION DEPARTMENT Integrated Waste Management Facilities Project Profile March 2008 CONTENTS 1. PURPOSE OF Project Profile .. 1 2. BASIC 1 Project 1 PURPOSE AND NATURE OF THE 1 NAME OF Project 2 LOCATION AND SCALE OF THE 2 NUMBER AND TYPES OF DESIGNATED PROJECTS COVERED BY THE Project 2 NAME AND TELEPHONE NUMBER OF CONTACT 3 3. OUTLINE OF PLANNING AND IMPLEMENTATION 3 Project PLANNING AND 3 Project 3 INTERFACING WITH OTHER 4 4. POSSIBLE IMPACTS ON THE 4 GENERAL DESCRIPTION OF THE 4 KEY ENVIRONMENTAL ISSUES AT THE CONSTRUCTION 7 KEY ENVIRONMENTAL ISSUES AT THE OPERATIONAL 11 5. MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT AND SITE 16 6. ENVIRONMENTAL PROTECTION 16 7. USE OF PREVIOUSLY APPROVED EIA 20 List of Tables Table 3. 1 Project Implementation 3 List of Figures Figure - Locations of Two Potential Sites for Development of IWMF Phase 21 Figure - Location Plan of IWMF Phase 1 at Tsang Tsui Ash Lagoons 22 Figure - Location Plan of IWMF Phase 1 at Shek Kwu Chau 22 Figure - Process Flow Diagram of an Incineration 23 Page 1 1.
Page 1 1. PURPOSE OF PROJECT PROFILE This project profile sets out the scope of the environmental issues associated with the construction and operation of the proposed Phase 1 of Integrated Waste Management
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}