Transcription of “Last Planner” is a registered trademark of the Lean ...
{{id}} {{{paragraph}}}
2007 Lean Construction Institute. All Rights Reserved. ii Last Planner is a registered trademark of the Lean Construction Institute. For licensing or additional information, please contact: Lean Construction Institute Any feedback on this workbook is most welcome. Please address your mailing to Iris Tommelein at or Glenn Ballard at Version , the original form of this document, was mainly produced by Iris Tommelein, with help from Glenn Ballard and Gregory Howell. Version , a substantial revision, was mainly the work of Farook Hamzeh, then a PhD student at the University of California, Berkeley; with help from Glenn Ballard. 2007 Lean Construction Institute. All rights reserved.
Work structuring is production system design comprising development of operation and process design in alignment with: product design, structure of supply chains, allocation of resources, and design-for-assembly efforts with the goal of making work flow more reliable and quick while delivering value to the customer. A key tenet of lean ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}