Transcription of MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION
{{id}} {{{paragraph}}}
Checked: SGJ Date: June 2012 FHPP FHPP Hepton Court, York Road, Leeds, LS9 6PW June 2012 MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION for the Replacement Chiller Works at Prepared by Checked: SGJ Date: June 2012 FHPP Revision Date Details Author Checked - June 12 tender Issue MA SGJ Checked: SGJ Date: June 2012 FHPP INDEX SECTION DESCRIPTION PAGE No SECTION - Introduction .. 1 SECTION - General Requirements .. 3 SECTION Scope of Works .. 19 SECTION Enabling Works .. 22 SECTION Chilled Water System .. 30 SECTION Chilled Water Pipework and Fittings .. 45 SECTION Controls.
2.05 Tender Information The drawings relating to the Contract provided by the Bank’s representative shall be read in conjunction with each other and all relevant Specifications in the preparation of the Tender by the Contractor. No claim will be considered on the grounds of want of knowledge in this respect.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}