PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: air traffic controller

MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION

Checked: SGJ Date: June 2012 FHPP FHPP Hepton Court, York Road, Leeds, LS9 6PW June 2012 MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION for the Replacement Chiller Works at Prepared by Checked: SGJ Date: June 2012 FHPP Revision Date Details Author Checked - June 12 Tender Issue MA SGJ Checked: SGJ Date: June 2012 FHPP INDEX SECTION DESCRIPTION PAGE No SECTION - Introduction .. 1 SECTION - General Requirements .. 3 SECTION Scope of Works .. 19 SECTION Enabling Works .. 22 SECTION chilled water System .. 30 SECTION chilled water Pipework and Fittings .. 45 SECTION Controls .. 63 SECTION Sundry Works in Connection with Engineering Services .. 76 APPENDIX A - Schedule of Tender Drawings .. App/1 APPENDIX B - Summary of Tender .. App/2 APPENDIX C - Project Programme.

prepare tender submissions for the chilled water plant replacement works at the Headquarters building for the European Bank for Reconstruction and Development (EBRD) that is located at One Exchange Square, London EC2A 2JN. The intention of this Project is to replace 3No existing water cooled chillers with new equally

Tags:

  Electrical, Specification, Technical, Mechanical, Water, Plants, Chilled, Chilled water plant, Mechanical and electrical technical specification

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION

Related search queries