Checked: SGJ Date: June 2012 FHPP FHPP Hepton Court, York Road, Leeds, LS9 6PW June 2012 MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION for the Replacement Chiller Works at Prepared by Checked: SGJ Date: June 2012 FHPP Revision Date Details Author Checked - June 12 Tender Issue MA SGJ Checked: SGJ Date: June 2012 FHPP INDEX SECTION DESCRIPTION PAGE No SECTION - Introduction .. 1 SECTION - General Requirements .. 3 SECTION Scope of Works .. 19 SECTION Enabling Works .. 22 SECTION Chilled Water System.
Y:\00-Enquires\E4340\4.0 FHP Specifications\4.8 Combined M&E\E4340 M&E Technical Specification.docx 5 ‘Provision Works’ shall mean and include all equipment to be provided and work to be done under the contract and shall include supplying, fixing, testing, regulation and commissioning of the installations described in the Specification.