Transcription of METHOD STATEMENTS FOR CLEANING OPERATIONS
{{id}} {{{paragraph}}}
METHOD STATEMENTSFOR CLEANING OPERATIONS1 floor CLEANING METHOD Statement floor CLEANING Task: Sweeping Equipment: Brush Dustpan and Brush Gloves Scraper Warning Signs METHOD hands and put on the warning signs in the area, ensuring all signs are up all large items of litter, for example, crisp packets, a scraper to remove any chewing gum from the floor with the edges sweep vertically going from left to gloves and wash handsTask: Mopping Equipment Required: Bucket with Compatible Wringer Gloves Mop Handle Mop Head Warning Signs floor Cleaner or General-Purpose Detergent 2 METHOD 1. Wash hands and put on gloves 2. Display the warning signs in the area, ensuring all signs are visible 3. Sweep the floor (Refer to the Sweeping METHOD Statement) 4. Prepare the CLEANING solution in a well-ventilated area (refer to manufacturers instructions).
5. Remove old polish from floor edges and chewing gum using an Edge Cleaning Tool/Scraper . 6. Attach the floor pad to the Rotary Floor machine (refer to manufacturers’ instructions) 7. Put on goggles . 8. Prepare the Floor Stripper solution in a well-ventilated area (refer to manufacturers’ instructions) and add to
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}