Transcription of Microsoft Project Scheduling Manual UH FINAL
{{id}} {{{paragraph}}}
Scheduling Basics Critique & Create Training 12/16/09. Table of Contents- Scheduling Page 2. Introduction: Goals of the Scheduling Training 4. Scheduling Terminology 5-8. Chapter 1: How to Critique A Schedule: Critical Path(s) and Float 9,10. Activities Level of Detail & Logic in Sequencing of Tasks 11. Major Issues and Obstacles for the Project 12. Organization of Tasks in Groups ( Project Language)13. Contract Data 14. Baseline 15. Class Exercise (Review Two Schedules) 16,17. Sample Schedule Review Report 18-22. Chapter 2: How to Create A Schedule: Plan, Plan and then Plan Some More Class Exercise Project 23. Identify Phases within Project 24. Identify Areas within the Phases 24. Identify Components within Areas 24. Identify Activities within Components 24.
Goals of this Training: This is not an in depth training on scheduling; rather it is intended to show how to critique a schedule as the program manager for a project
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
PROJECT DESIGN, Project Design Manual, Chapter 1100 Practical Design, Design Manual, Design, Project Design Guide, Project/programme planning Guidance manual, Project /programme planning Guidance manual, Project, Design-Build Manual, Georgia Department of, Georgia Department of Transportation, Project Plan Manual, Manual