Transcription of Model 60 SE 600 cc Dirt Capacity - Spinner II® …
{{id}} {{{paragraph}}}
2 gpm at 60 psigModel 60 SE600 cc dirt CapacityInstallation InstructionsParts ListService InstructionsBulletin 71293 Three connections are required at the centrifuge:1. Oil Inlet (1 2-in. NPT Female Pipe) Unscrew plastic ship-ping #8 hose from point of highest Oil Outlet (1 2-in. NPT Female Pipe) Unscrew plasticshipping #8 hose to crankcase above oil Air Inlet (1 4-in. NPT Female Pipe) Unscrew plastic ship-ping #4 hose from any convenient point onair supply to air valve cartridge inlet. Do not removecartridge loss of cartridge seal will damage Route hoses to clear exhaust and all movingparts and fasten securely.
Model 60 SE 2 gpm at 60 psig 600 cc Dirt Capacity Installation Instructions Parts List Service Instructions Bulletin 71293
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}