Transcription of Model 70200 Universal Oil Primary Control
{{id}} {{{paragraph}}}
Model 70200 Universal Oil Primary Control Installation and Operating InstructionsFor Use By Qualified Service Technicians OnlyIt is important that the installation of the oil burner, piping and fittings, safety devices, controls, electrical wiring and equipment be done in accordance with national and/or local regulations of the authorities having jurisdiction over such Bailey Rd North Haven, CT 06473Ph 203-680-9401 Fx 203-680-9403 Tech Support 800-989-2275 Copyright 2019 Carlin combustion Technology, combustion Technology, Inc. Universal Replacement for Carlin, Beckett, Honeywell and ICM Controls On-Board LCD Screen no special tool needed Fully Programmable Settings 32 Cycle Fault History Alarm Contacts Communications Port Serviceman Reset Protection Blocked Vent Protection Built-in Pump Prime Recessed Spade Connectors Provides CAD Cell Reading in OHMSP ower input (red/white wire).
combustion air proving switch (Intake) or a blocked vent switch (Exhaust): Intake: When the burner is equipped with a combustion air proving switch, the “Intake” setting should be selected. At each burner startup, the control will check the air intake during pre-purge (Valve On Delay)*. If the air is blocked, the control will
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}