PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: air traffic controller

NIPPLE UP BOP - EDC Romfor

Romfor International Ltd. STEP SUB PROCEDURE REMARKSNIPPLE UP BOP1 Discuss Operator BOP requirements with Requirements - Hard Hat, Safety Glasses, WorkGloves, Steel Toe Shoes, Back Support, and Anti-FallProtection. Fit for Duty check on all JSA for Nippling up procedures with Rig Manager to include:-Stack design (Class II, IV, etc.)- Spacing out of Position, size and pressure rating of choke Number and size of trucks the weight of the Pick-up lines are of sufficient size and rating to hoistBOP, (Including all third party equipment).- Cellar access, V-Door removal if Presence of gas in cellar The use of any third party services, ie. NIPPLE upcrews, testing service, stack winches, cranes,trucks, Any hot work permit or confined space permitVerify the following items are ready or available, asrequired:-Adequate tie off points are in place to assure 100%tie qualified man to be way API ring size hammer wrenches and hammers, size Bolts are the proper size and Extra set of door seals are on Proper DSA or spools if Tag Scaffolding, if used is inspected and installed AWARE OF CONTRACTAND PERMIT Full Body Harnesses are tobe inspected prior to any all third party to Romfor Drilling Policy forRam configurations and the position and height ofwellhead needed for class of recommends the use of winchtrucks to assist handling wire rope rating tables forproper load limits and generalcondition of the pick-up es

STEP SUB PROCEDURE REMARKS Romfor International Ltd. NIPPLE UP BOP 2 Complete any hot work and confined space permit requirements before entering cellar, if required.

Loading..

Tags:

  Nipple, Nipple up bop

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of NIPPLE UP BOP - EDC Romfor

Related search queries