PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bankruptcy

October 2021

October 2021 Multi-Sector General Permit (MSGP) LAR050000 / AI# 86163 Modified Page 1 of 128 LPDES MULTI-SECTOR GENERAL PERMIT FOR STORM WATER DISCHARGES associated WITH INDUSTRIAL activities TABLE OF CONTENTS 1. PART 1: COVERAGE UNDER THIS PERMIT .. 3 2. PART 2: NOTICE OF INTENT REQUIREMENTS .. 18 3. PART 3: BEST MANAGEMENT PRACTICES, LIMITATIONS, AND MONITORING REQUIREMENTS .. 22 4. PART 4: STORM WATER POLLUTION PREVENTION PLAN (SWPPP) .. 46 5. PART 5: EVALUATIONS, RECORD KEEPING, AND REPORTING .. 54 6. PART 6: SECTOR-SPECIFIC SWPPP REQUIREMENTS .. 59 SECTOR A. Timber Products .. 59 SECTOR E. Glass, Clay, Cement, Concrete, and Gypsum Products .. 59 SECTOR F. Primary 60 SECTOR G.

associated with industrial activity from the facility’s primary industrial activity and co-located industrial activity(ies), as defined in Part 7, provided that these industrial activities are included in Table 1, or the facilities must be notified of permit eligibility by the Louisiana Department of Environmental Quality (LDEQ).

Loading..

Tags:

  Activities, Associated

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of October 2021

Related search queries