Transcription of Offshore Helideck Design Guidelines - crs.kz
{{id}} {{{paragraph}}}
Offshore Helideck Design Guidelines Prepared by John Burt Associates Limited / BOMEL Limited for the Health and Safety Executive ii INTENTIONALLY BLANK iii PREFACE These Offshore Helideck Design Guidelines have been developed in response to an increasing awareness within the industry that Offshore Helideck operations can encounter problems that potentially affect flight safety. These problems may be caused by Helideck layout and equipment deficiencies, structure-induced turbulence, hot gas plumes generated by turbines and flares or the effects of wind/wave-induced motions on helidecks on floating structures and vessels. Often the problems result in operating limits being imposed by the helicopter operators. Recommendation (i) in CAA Paper 99004, a joint HSE / CAA sponsored report into Offshore Helideck environmental issues, was the main starting point for these Guidelines along with an increasing number of non-conformities found during Helideck inspections.
iii PREFACE These offshore helideck design guidelines have been developed in response to an increasing awareness within the industry that offshore …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
The selection and training of offshore installation, THE SELECTION AND TRAINING OF OFFSHORE INSTALLATION MANAGERS, Offshore, Hazardous Locations Training, Intertek, The selection, Installation, HID Inspection Guide Offshore, Training, 17.5 kV Air insulated switchboard, ELECTRICAL, INSTRUMENTATION & CONTROL, ELECTRICAL, INSTRUMENTATION & CONTROL SOLUTIONS FOR, Technip in Asia Pacific