PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: quiz answers

Offshore Wind Plant Electrical Systems - BOEM

NREL is a national laboratory of the Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Offshore wind Plant Electrical Systems BOEM Offshore Renewable Energy Workshop Ian Baring-Gould July 29-30, 2014 NATIONAL RENEWABLE ENERGY LABORATORY Major Offshore wind Farm BOS Components 2 Foundations Grounded (monopile, gravity, tripod, etc.) Floating (ballast, mooring, buoyancy stabilizations, etc.) wind farm collector system Inter-turbine Medium Voltage (MV) AC cables (typically kV) Substation platform with transformer and Electrical equipment Converter platform if High Voltage (HV) DC transmission is used Transmission to shore HVAC or HVDC submarine cable Cable landing HVAC or HVDC land cable On-shore converter station for HVDC Onshore substation/interconnection So

• The voltage is stepped up to transmission level (69 kV or above) by a substation transformer facility • In North America Wind Power Plants (WPP) are predominantly connected to HV transmission • Interconnection to distribution systems level is common for only small wind farms

Loading..

Tags:

  System, Electrical, Power, Transmissions, Plants, Offshore, Wind, Offshore wind plant electrical systems

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Offshore Wind Plant Electrical Systems - BOEM

Related search queries