Transcription of Onsite Wastewater (Septic System) Application Packet
{{id}} {{{paragraph}}}
Onsite Wastewater (Septic System) Application PacketAugust 2, 2022 Dear Onsite Wastewater Customer: DHEC has had a significant increase in the number of permit applications for septic tanks, also called Onsite Wastewater systems. More i nformation may be found on our webpage at: As of the end of July 2022, we have about 3,000 pending permit applications. At this time, in some areas, it s tak ing up to 18 weeks to process septic tank applications from the time the Application is deemed complete, and the s ite is prepared by the a pplicant for evaluation.
Application Packet. Application: Ø Complete the entire document with required information. Ø Save as a PDF file. ... Check here if the sketch is attached on a separate sheet or on the plat instead of this application. Sketch must include labelling the location, dimensions, and distance from property lines of existing and/or proposed: ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}