PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bachelor of science

Operation Manual

WiringConnectionConnections should only be made with the powersupply turned separate routes for the Pressure switch wiring andany power or high voltage wiring. Otherwise, malfunctionmay result due to that the FG terminal is connected to ground whenusing a commercially available switch-mode powersupply. When a switch-mode power supply is connected to the product,switching noise will be superimposed and the product specification can nolonger be met. This can be prevented by inserting a noise filter, such as aline noise filter and ferrite core, between the switch-mode power supply andthe product, or by using a series power supply instead of the switch-modepower ON and OFF point of the Pressure (Hysteresis mode)When the pressure exceeds the set value, thePressure switch will turn the pressure falls below the setvalue by the amount of hysteresis ormore, the Pressure switch will turn default setting of the output set valueis the central value between theatmospheric pressure and theupper limit of the rated pressurerange.

T h edi spl ay rtoz w nbu simultaneously for 1 second. For the initial operation, always perform zero clear with no pressure applied. 4. Press the button to complete the setting. For models with 2 outputs, [P_2] or [n_2] will be displayed. Set as above. ∗: If the button is pressed for 2 seconds or longer, the setting is fixed and measurement

Loading..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Operation Manual

Related search queries