Transcription of Paint Inspection Pg of Daily Coating Inspection …
{{id}} {{{paragraph}}}
Paint Inspection Date: / / Su M Tu W Th F Sa Pg of Project #: Copy to: Daily Coating Inspection Report Inspector: QC Super Owner Contr Project/Client: Location: Attachments: DFT Sheet NCR/CAR. Description: Requirements: Contractor: Spec #: Revision #: Description of Areas and Work Performed Hold Point Inspections Performed 1. Pre Surface Preparation/Condition and Cleanliness 2. Surface Preparation Monitoring 3. Post Surface Preparation/Cleanliness and Profile 4. Pre Application Prep/Surface Cleanliness 5. Application Monitoring/Wet Film Thickness (WFT). 6. Post Application/Application Defects 7. Post Cure/Dry Film Thickness (DFT). 8. Nonconformance/Corrective Actions Follow-Up 9. Final Inspection Approved by: Surface Conditions Ambient Conditions : : : : New Maint Primer/ Paint Age/Dry/Cure Time (Indiciate AM or PM).
Surface Preparation Start Time: Finish Time: Est Sq Ft: Surface Conditions Application Surface Cleanliness and Profile Measurement Paint Inspection
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}