Transcription of PERFORMANCE SPECIFICATION GUIDELINE
{{id}} {{{paragraph}}}
1 PERFORMANCE SPECIFICATION GUIDELINE FOR THE INSTALLATION OF CURED-IN-PLACE PIPE (CIPP) 2nd Edition June 2011 Prepared by Gerry Muenchmeyer, Muenchmeyer Associates, LLC 1st Edition CIPP Peer Review Committee Lynn Osborn Insituform Technologies Geoff Yothers Inliner Technologies Ed Kampbell National Liner Mike Burkhard Reline America Dave Fletcher Applied Felts John Williamson Nova Pipe Dave Kozman American Water Mike Cannon American Water Jim Harris Murfreesboro, TN 2nd Edition Peer Review Committee NASSCO CIPP Committee Lynn Osborn, Insituform Technologies Steve Gearhart, CIPP Corp Ted DeBoda, NASSCO Steve Hirtz, SAK Construction NASSCO, Inc. 11521 Cronridge Drive, Suite J Owings Mills, MD 21117 2 Disclaimer: These PERFORMANCE SPECIFICATION guidelines (PSG) were prepared by NASSCO and peer reviewed by industry professionals These PSG s are not specific to any one product and should be considered a GUIDELINE only.
PERFORMANCE SPECIFICATION GUIDELINE FOR THE INSTALLATION OF CURED-IN-PLACE PIPE (CIPP) 2nd Edition June 2011 ... point to access point and shall be free of all defects that will affect the long term life ... 1.2.1 The following documents form a part of this specification to the extent stated
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
ICH Q6A Guideline, ICH Q6A Guideline Specifications, Form, Specifications, Long, Nevada Performance Guidelines, Guideline, The CONSTrUCTION OF TIlT-UP, GUIDELINE SPECIFICATIONS, GUIDELINES, GUIDELINES GUIDELINES, The Ashford, TENNIS COURT, PAVEMENT CUT AND REPAIR STANDARDS MANUAL, PAVEMENT CUT AND REPAIR STANDARDS MANUAL Department, Dallas, Application Guideline and Service, Application Guideline and Service Manual