Transcription of Piping Inspection Code - Nuclear Regulatory Commission
{{id}} {{{paragraph}}}
ENT000447. Submitted: March 30, 2012. Piping Inspection code Inspection , Repair, Alteration, and Rerating of In-Service Piping Systems API 570. Second Edition, October 1998. -1- Piping Inspection code Inspection , Repair, Alteration, and Rerating of In-Service Piping Systems Downstream Segment API 570. Second Edition, October 1998. -2- FOREWORD. It is the intent of API to keep this publication up to date. All Piping system owners and operators are invited to report their experiences in the Inspection and repair of Piping systems whenever such experiences may suggest a need for revising or expanding the practices set forth in API 570. This edition of API 570 supersedes all previous editions of API 570, Piping Inspection code : Inspection , Repair, Alteration, and Rerating of In-Service Piping Systems.
be required are SNT-TC-1A or CP-189; or AWS Welding Inspector certification. The examiner’s employer shall maintain certification records of the examiners employed, including dates and results of personnel qualifications, and shall make them available to the inspector.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}