UWA Plant and equipment safety procedures 1 of 20 Plant and equipment safety procedures Contents: Policy: procedures : Background Administrative Arrangements Legal Requirements Consultation Definitions Planning & Purchasing Responsibilities Risk Management Risk Identification Risk Assessment Risk Control Standard Operating procedures (SOPs) University Installation, Erection & Commissioning of Plant Deans and Heads of School / Centre Inspection & Maintenance Office of Facilities Management Powered Plant Supervisors Electrical Plant Staff Plant used to lift or suspend loads including people and materials Contractors Industrial Lift Trucks Students and Visitors Damaged Plant safety and Health Office Alteration to Plant Dismantling Plant Registration of Plant Licensing and certificate of competency Plant Not in Use Information, Instruction and Training Record Keeping
The Hierarchy of Control is the established priority order for the types of measures to be used to control risks. 1. Elimination of the hazard 2. Substitution eg of the equipment or substance 3. Engineering controls, controls, which use engineering measures to change the physical characteristic of plant to eliminate or reduce risk. ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}