Transcription of PMBOK GLOSSARY - apicollege.com
{{id}} {{{paragraph}}}
Copyright: Prof. A. Jaafari (2003). All rights reserved page 187 PMBOK GLOSSARY Accountability Matrix. See responsibility assignment matrix. Activity. An element of work performed during the course of a project. An activity normally has an expected duration, an expected cost, and expected resource requirements. Activities are often subdivided into tasks. Activity Definition. Identifying the specific activities that must be performed in order to produce the various project deliverables. Activity Description (AD). A short phrase or label used in a project network diagram. The activity description normally describes the scope of work of the activity. Activity Duration Estimating. Estimating the number of work periods which will be needed to complete individual activities.
Copyright: Prof. A. Jaafari (2003). All rights reserved p age187 PMBOK GLOSSARY Accountability Matrix.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Work Breakdown Structure, Work, Element, Work to be Performed Work, WORK BREAKDOWN STRUCTURES FOR DEFENSE, Structure, Glossary of Software Engineering Terms, ASSUMPTION MANAGEMENT Purpose, Scheduling, Estimating, Project/Construction, Scheduling, Estimating, Project/Construction Management, Standard for Earned Value, Standard for Earned Value Management Systems Intent, AD-A248 GLOSSARY, Defense Technical, AD-A248, GLOSSARY