Transcription of POULTRY COST OF REARING 100 BROILERS (FORTNIGHTLY …
{{id}} {{{paragraph}}}
POULTRY . cost OF REARING 100 BROILERS ( fortnightly batches . (Amount in Rs.). A. capital cost . 1. Construction of shed brick and mud wall, bumboo, purlins, thatched roof @ 1 sq. ft. per bird for 5 batches of 100 birds each 500 sq. ft. @ per 35, 2. Equipment @ per bird for 500 birds 7, TOTAL A' 42, B. RECURRING cost . 1. cost of day old chicks 4 batches of 100+5% extra 420 chicks @ each 6, 2. cost of fed for 4 batches of 102 birds each @ kg. Per bird @ / kg. 12, 3. cost of medicines, vaccines and misc. charges for 4 batches of 102 birds each 2, 4. Insurance of birds 420 birds at per birds 5. Insurance of sheds @ per per year TOTAL B' 21, TOTAL - A' + B' 64, UNIT cost 64, BANK LOAN (90%) 57, ASSUMPTIONS. A. Technical parameters fortnightly batches of 100 birds in deep litter system No.)
POULTRY COST OF REARING 100 BROILERS (FORTNIGHTLY BATCHES (Amount in Rs.) A. CAPITAL COST 1. Construction of shed – brick and mud wall, bumboo, purlins,
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Levered and Unlevered Cost of Capital, Capital, Cost, Weighted Average Cost of Capital WACC, Weighted Average Cost of Capital, Long-term investment, the cost of capital, Oecd, Chapter 11 The Cost of Capital, Equipment Sizing and Capital Cost Estimation, Cost of Capital for Pharmaceutical, Biotechnology, Secular Stagnation: The Long View