PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: air traffic controller

Power Factor Testing Nov2005 - Doble Engineering

THE VALUE OF Power Factor TESTINGNov 1, 2005 12:00 PMby John Bleyer and Phillip Prout, National GridNATIONAL GRID DISCOVERED A HIGH Power Factor DURING ACCEPTANCETESTING of a new 40-MVA transformer in 2004. The unit was then returned to the factory for repairs,burdening both the utility and manufacturer with additional costs and delays. This article reviews theinformation gathered and lessons learned from this event, including Testing and root-cause determinationresults from the teardown/repair Grid's electricity delivery companies in the United States serve million electricity customers inNew England and upstate New York through more than 1200 substations. As part of a substation expansionproject, a 24/32/40-MVA, 115- transformer was purchased and installed at a National Gridsubstation in New transformer was delivered to the substation.

The National Grid transformer specification states that the power factor of the insulation system shall not exceed 0.5% at 20°C. As part of the investigation into the high power factor, the transformer manufacturer retested the power factor with similar results. The high-voltage bushings were replaced and the unit was retested. The results

Loading..

Tags:

  Testing, Power, Factors, Investigation, Power factor testing nov2005, Nov2005

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Power Factor Testing Nov2005 - Doble Engineering

Related search queries