Transcription of PowerChute Network Shutdown v4.2 Installation Guide
{{id}} {{{paragraph}}}
Installation GuidePowerChute Network Shutdown Linux /Unix Hyper-V /SCVMM VMware (Nutanix , SimpliVity, HyperFlex) Nutanix 990-2838Q-00111/2020 Schneider Electric Legal DisclaimerThe information presented in this manual is not warranted by Schneider Electric to be authoritative, error free, or complete. This publication is not meant to be a substitute for a detailed operational and site specific development plan. Therefore, Schneider Electric assumes no liability for damages, violations of codes, improper Installation , system failures, or any other problems that could arise based on the use of this information contained in this Publication is provided as is and has been prepared solely for the purpose of evaluating data center design and construction.
PowerChute Network Shutdown: Installation Guide •A UPS with a Smart Slot and a Network Management Card (part number AP9617, AP9618, AP9619, AP9630, AP9631, AP9635) with a firmware version of 3.3.1 or later, or
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Installation of Pressure-Relieving Devices in Refineries, Installation, PROFIBUS Installation Guideline, Batteries Part 2: Installation, Commissioning and Operation, Rotax, Installation 2, 2 Main Repeater INSTALLATION, Main Repeater Installation, IGNITION INTERLOCK DEVICE INSTALLATION, INSTALLATION INSTRUCTIONS & PARTS DIAGRAM